
October 2011
CLP Envirogas operate 73 Jenbacher gas engines running on landfill gas at various locations throughout the UK.
We have used Powerfal ltd since 2001 for the refurbishment of cylinder heads, turbochargers, heat exchangers, connecting rods plus fabrication and general engineering requirements associated with the running of these engines particularly in the South West.
We have been more than satisfied with the quality of work and the general response from Powerfal, who have always been ready to carry out our requirements, sometimes at short notice.
R.Edge,
AMIMarE,
Operations Manager
CLP Envirogas Ltd